Green Energy Integration Demonstration Park Project of Changchun City

Information Source: Jilin Provincial Commercial Information Center
Printing
| Font size:
medium |

1. Introduction to the Project

1.1 Project background

1.1.1 Project introduction

Under the backdrop of the global energy structure's transformation, the integrated photovoltaic, storage, and charging technology, with its outstanding performance and potential, is rapidly emerging as a core driving force for the future development of green energy. The Green Energy Integration Demonstration Park project is a new energy + industrial park, whose primary objective is to achieve the production, storage, and utilization of new energy through green energy, promoting the green and low-carbon transformation of energy.

The project is located in the digital economy starting area of Jingyue High-tech Zone in Changchun City, to promote the use of low-carbon technologies and products, such as distributed photovoltaic, ground source heat pump, hydrogen energy, etc., to reduce carbon emissions in the park. Build a green transport network, promote the use of new energy vehicles, and reduce carbon emissions in the transport sector. Implement measures to save energy and reduce consumption, improve energy efficiency, and reduce energy and material consumption. Cultivate and gather green and low-carbon industries such as energy conservation, environmental protection, clean production, clean energy research and development, and form green and low-carbon industrial clusters. Introduce and cultivate strategic emerging industries such as new energy and new materials, and promote industrial transformation and upgrading in the park.

1.1.2 Market prospect

(1) International market supply and demand situation and forecast

With the strengthening of global action against climate change, governments have actively introduced policy measures to promote the development of new energy. For example, the European Union, the United States, and China have developed long-term energy plans that prioritize clean energy sources such as wind and solar. The IEA also predicts that under existing policy and market conditions, global renewable energy installed capacity will reach 7,300 gigawatts between 2023 and 2028, with wind and solar combined to overtake hydropower and nuclear power, respectively, in the next few years. From above all, this suggests that the electricity market of the future will be more dependent on renewable energy.

At a regional level, the Asia-Pacific region's electricity demand growth is mainly met by renewable energy, with nearly 60% of the incremental demand in 2022 provided by renewables. The Americas region is also showing signs of renewable energy growth, with electricity demand in the region growing by 2.3% in 2022, with renewables accounting for the largest share. In Europe, the rapid growth of renewables has led to a decline in electricity generation from fossil fuels, which is expected to lead to a significant reduction in coal and gas generation by 2025.

In addition, energy storage technology is also regarded as an important means to support new energy generation. As the proportion of renewable energy in the power generation structure increases, how to balance the power system becomes a major challenge, and energy storage systems through frequency control and peak-valley spread arbitrage will play an increasingly important role.

With the transformation of the global energy structure and the support of national policies, the new energy industry represented by wind energy and photovoltaic has shown a strong growth momentum in the domestic market. In order to achieve the Carbon Peaking and Carbon Neutrality Goals, the state has continuously introduced favorable policies, which has promoted the steady growth of new energy installed capacity and power generation, of which wind power and photovoltaic performance is particularly outstanding. Meanwhile, technological progress and scale effects have also promoted the reduction of system construction costs, making the competitiveness of new energy in the power market continue to increase.

(2) Project market prospect

In May 2022, the National Development and Reform Commission and the National Energy Administration issued the "Implementation Plan on Promoting the High-quality Development of New Energy in the New Era", which proposed seven policy measures in innovative development and utilization models and the construction of new power systems, pointing out the direction for the development of the new energy industry. On November 13, 2023, the Provincial Energy Bureau issued the "Implementation Plan on the Distribution Right of Four Pilot Modes of ‘Green Electricity + Consumption’ New Energy Construction Indicators (trial)”. For zero carbon industrial park pilot supporting the construction of incremental distribution network, load (wind and fire bundle) supporting new energy consumption, new energy direct supply (including amino green energy) and isolated network operation four pilot models.

At present, Jingyue District continues to gather key elements for the development of film and television industry, improve the ecosystem of film and television industry, accelerate the high-quality development of film and television cultural and creative industry, hone the business card of Changchun "film city", and take the new energy industry as an important development direction. With the production of projects such as the International Film Capital shooting base, Wandamao, computing center, film and television cultural and creative incubator, etc., annual electricity consumption is expected to reach 2.5 billion KWH. Planning and construction of "green energy integration demonstration park" is not only an important measure to implement the development of the province's new energy industry, but also in line with the current development needs of Jingyue District. The project construction is very necessary, and the market prospects are optimistic.

1.1.3 Advantageous conditions of project construction

(1) Policy advantageous

In terms of photovoltaic, the "14th Five-Year Plan" New Energy Storage Development Implementation Plan points out that a high proportion of renewable energy base is supported. Relying on the stock and the "14th Five-Year Plan" new cross-provincial transmission channels, in the Northeast, North China, Northwest, Southwest and other regions to give full play to the role of large-scale new energy storage, through the "wind, water, fire and storage integration" multi-energy complementary model, to promote large-scale new energy across provincial and regional transmission and consumption, improve channel utilization and renewable energy proportion. We will increase support for "new energy + storage". In areas with a high proportion of new energy installed capacity and high system peak load operation pressure, we will actively guide new energy power stations to configure new energy storage in a market-oriented way. For new energy power generation projects that support the construction of new energy storage or implement energy storage in a shared mode, combined with the level of energy storage technology and system benefits, priority can be given to competitive configuration, project approval, grid-connection timing, guaranteed utilization hours, and power service compensation assessment.

The National Energy Administration and the Ministry of Science and Technology issued the “14th Five-Year Plan” for Scientific and Technological Innovation in the Field of Energy. The Plan puts forward the overall goal of energy science and technology innovation before 2025. Focusing on advanced renewable energy, new power systems, safe and efficient nuclear energy, green and efficient fossil energy development and utilization, and energy digitalization and intelligence, it determines relevant tasks of concentrated research, demonstration tests and application promotion, and formulates a technology roadmap. In combination with the "14th Five-Year Plan" energy development and project layout, relevant demonstration projects have been deployed to effectively undertake demonstration application tasks, and policies and measures to support technological innovation, demonstration testing, and application promotion have been clarified.

(2) Location advantageous

The transportation network of Changchun is well developed, with various modes of transportation such as railway, highway, air and water. Changchun is the junction point of many railway trunk lines such as Harbin-Dalian Railway, Beijing-Harbin Railway and Jilin-Hunchun Railway, as well as the starting point or passing place of many expressways such as Beijing-Harbin Expressway and Harbin-Dalian Expressway. Changchun Longjia International Airport is one of the largest aviation hubs in Northeast China, with nearly 100 domestic and foreign routes. Changchun has an important strategic position in the Northeast Asian economic circle. As an international metropolis in Northeast Asia, Changchun is an important hub connecting Northeast China and North China, as well as an important political, economic and cultural center in Northeast China.

Jingyue High-tech Zone is located in the southeast of Changchun City, and this geographical location makes Jingyue High-tech Zone an important area of Changchun City, connecting with the main transportation network of the city.

(3) Scientific and technological talents advantageous

Jingyue High-tech Zone has the highest quality scientific and technological innovation resources, bringing together 15 colleges and universities in the area, with 200,000 college students, accounting for 42.7% of the city and 36.3% of the province; There are 333 national high-tech enterprises, 46 provincial and 83 municipal science and technology small giant enterprises respectively; There are 30 incubation vectors, including 14 at or above the provincial level, with a total area of 320,000 square meters. There are more than 1,100 incubating enterprises in total and 645 incubating enterprises. The incubation effect of the Jinchang Double Innovation Service Center (Jilin-Zhejiang Cooperation Innovation Service Center), listed enterprise accelerator, Jingyue Mass Innovation Building and other carriers has been continuously enhanced. It has built 12 national R & D service platforms, 147 provincial and ministerial R & D service platforms, 9 key scientific research institutions above the municipal level, 35 enterprise R & D platforms, and a total of nearly 40,000 first-line scientific researchers. It is an important talent training, experimental R & D, and achievement transformation base in Changchun City and even Jilin Province.

1.2 Contents and scale of project construction

The project focuses on all energy-consuming enterprises that will soon land in the film and television industrial park in Jingyue District, and selects an area of about 7 square kilometers to set up the park. The infrastructure construction includes comprehensive service office building, research and development plant, high-standard plant, living facilities and other infrastructure construction to provide a perfect production and living environment for the park.

In terms of new energy investment, first, the "film and television industry green energy integration demonstration park" is planned to invest 6 billion yuan, involving green electricity, green energy heating, energy storage and other projects; Second, supporting industries in the park; Third, in accordance with the overall planning and gradual implementation of the idea, to adopt the "planning a batch, mature a batch, construction a batch, reduce the cost of a batch" policy, to create green energy integration demonstration park.

1.3 Total investment of the project and capital raising

The total investment of the project is 6 billion yuan, of which the construction investment is 4.8 billion yuan.

1.4 Financial analysis and social evaluation

1.4.1 Main financial indexes

After the project reaches the production capacity, the annual sales revenue is 3.79 billion yuan, the profit is 1.25 billion yuan, the investment payback period is 6.8 years (after the tax, including the construction period of 2 years), and the investment profit rate is 20.8%.

Note: “10 thousand yuan” in the table is in RMB

1.4.2 Social evaluation

The construction is in line with the development direction of new energy industry in Jilin Province. After the completion of the project, it will be conducive to forming a complete industrial chain, promoting industrial upgrading, driving the development of downstream industries, and driving local employment. It will play a good role in promoting local social development and promoting the progress of pillar industries in Jingyue District of Changchun.

1.5 Cooperative way

Sole proprietorship, joint venture, cooperation.

1.6 What to be invested by the foreign party

Funds, other methods can be discussed offline.

1.7 Construction site of the project

Changchun City Jingyue High-tech Zone Digital Economy Starting Zone

1.8 Progress of the project

The project proposal has been prepared.

2. Introduction to the Partner

2.1 Basic information of the unit

Name: Changchun Jingyue High-tech Industrial Development Zone Investment Promotion Bureau 3

Add: No.1572, Welfare Road, Jingyue High-tech Industrial Development Zone, Changchun City

2.2 Unit overview

Changchun Jingyue High-tech Industrial Development Zone was established in August 1995, formerly known as Changchun Jingyuetan Tourism Economic Development Zone. In August 2012, approved by the State Council, it was promoted to the national high-tech industrial development zone. The district has jurisdiction over 3 integrated towns and 7 sub-district offices with an area of 444 square kilometers and a total population of 440,000 people. Jingyue High-tech Zone has the largest artificial forest in Asia, with a forest and water area of 243 square kilometers, accounting for 51% of the total area, forming an ecological system pattern of "surrounded by forest and water on three sides, and connected to the main city on one side". Jingyue High-tech Zone has rich cultural heritage and colorful tourism resources. It is located in 3 5A scenic spots: Jingyuetan National Forest Park, the Palace Museum of the "Manchu Palace", Changying Century City, and 4 4A scenic spots: Agricultural Expo Park, Tianyi Hot Spring, Kaiser Forest Hot Spring, and Manshanli Research Base. There are 12 museums of various levels and 16 cultural relics, such as Changchun Chinese Optical Science and Technology Museum, Jilin Provincial Museum, Jilin Provincial Science and Technology Museum. Jingyue High-tech Zone brings together 15 institutions of higher learning, 8 national and provincial key research institutions, 12 national science and technology research and development platforms, 147 provincial and ministerial level research and development service platforms. Jingyue High-tech Zone urban supporting area of 65 square kilometers, 50 square kilometers of built-up area, Ecological street, Welfare road, Jingyue street, Linhe street and other "three vertical and six horizontal" trunk roads and through the city, the third ring road, the fourth ring road and the ring road, formed a relatively complete traffic network system. Jingyue High-tech Zone has successively won the national service industry comprehensive reform pilot zone, national e-commerce demonstration base, national advertising and creative demonstration park, national modern service industry digital media industrialization base, national information consumption pilot zone, national culture and technology integration demonstration base, national smart city pilot and other "national titles".

2.3 Contact method

Contact person: Chen Yudi

Tel: +86-431-84533738

Fax: +86-431-84533738

E-mail: 1254716151@qq.com

Postal code: 130000

Contact method of the city (prefecture) where the project is located:

Contact unit: Changchun Cooperation and Exchange Office

Contact person: Zhang Junjie

Tel: +86-15704317930

Fax: +86-431-82700590

E-mail: xmc82763933@163.com